Builds a loan amortization schedule allowing the effective interest-rate pattern, regular-payment pattern, and extra-principal pattern to vary by period.

Usage

amort_schedule_general(
  principal,
  n,
  i,
  i_type = "effective",
  m = 1L,
  k = 1L,
  timing = c("immediate", "due"),
  payment = NULL,
  extra_principal = 0,
  output = c("schedule", "summary"),
  tol = 1e-08
)

Arguments

principal

Positive numeric scalar. Initial outstanding balance.

n

Positive integer scalar. Maximum number of amortization periods.

i

Numeric vector of interest-rate inputs. It must have length 1 or n. A scalar is recycled over all periods.

i_type

Character vector indicating the interest-rate type. Allowed values are "effective", "nominal_interest", "nominal_discount", and "force". It must have length 1 or n.

m

Positive integer vector giving the conversion frequency for nominal rates. It must have length 1 or n.

k

Positive integer scalar. Number of amortization periods per year.

timing

Character scalar. Either "immediate" for payments at the end of each period or "due" for payments at the beginning.

payment

Payment specification. It may be:

  • NULL, in which case a level payment is calculated;

  • a nonnegative numeric scalar;

  • a nonnegative numeric vector of length n;

  • a function with arguments period, ob_start, and i_effective_period, returning one nonnegative payment.

extra_principal

Optional nonnegative extra-principal payments. It may be a scalar or a numeric vector of length n. Defaults to zero.

output

Character scalar. Either "schedule" for the complete amortization table or "summary" for a compact actuarial summary.

tol

Finite positive numeric scalar in monetary units used for zero-balance detection and the negative-amortization threshold.

Value

With output = "schedule", a tibble with one row per realized period.

With output = "summary", a one-row tibble containing the initial principal, number of realized periods, total interest, total paid, ending balance, and an indicator of negative amortization.

Details

The function extends the fixed-pattern workflow of amort_schedule without modifying that function. It supports:

  • a scalar interest rate recycled over all periods;

  • a vector of interest rates, one for each period;

  • a level payment computed automatically;

  • a scalar or period-specific payment vector;

  • a payment function depending on the current loan state.

Original log accumulation rates are converted directly to period rates. Level-payment discount factors use cumulative log growth, rather than products of rounded accumulation factors. Period rates must remain finite and greater than -1; a displayed annual equivalent may overflow even when the period rate is representable. The term is n / k years.

Each value of i is interpreted as an annual rate under its associated i_type and m. It is first converted to an annual effective rate and then to the effective rate for one amortization period: $$i_j^{(p)} = (1 + i_j)^{1/k} - 1.$$

When payment = NULL, the level payment is determined from the period-specific discount factors. For payments in arrears, $$P = \frac{L}{\sum_{j=1}^{n} \prod_{h=1}^{j}(1+i_h^{(p)})^{-1}}.$$

For payments in advance, the discount factors correspond to payment times \(0,1,\ldots,n-1\).

A payment smaller than the interest charged may produce negative amortization. The schedule identifies such periods explicitly.

Negative amortization means that interest exceeds the total payment, including extras, by more than tol. This condition applies to both timings, including interest accrued after an advance payment. Under due timing, the principal columns continue to record payments before interest; the negative-amortization flag refers to the net debt movement.

On a payoff row the regular payment is applied first and extras are capped at the remaining debt; no callback is evaluated after full payoff. This allocation differs from amort_schedule, which preserves the requested extra first. Both cap total cash flow at the amount due. Automatically calculated level payments are determined before extras and are not recast by this function. The discount sum is evaluated in log space before combining it with the principal. Active balances require a positive, representable calculated payment; non-finite monetary ledgers cause errors. A principal below tol may produce an empty schedule, and small residual balances may be treated as zero within that absolute tolerance. Storage grows with n; feasible terms are limited by integer indexing and available memory.

Examples

# Level payments and a constant rate
amort_schedule_general(
  principal = 100000,
  n = 12,
  i = 0.12,
  i_type = "nominal_interest",
  m = 12,
  k = 12
)
#> # A tibble: 12 × 15
#>    period ob_start i_effective_annual i_effective_period interest payment
#>     <int>    <dbl>              <dbl>              <dbl>    <dbl>   <dbl>
#>  1      1  100000               0.127               0.01   1000     8885.
#>  2      2   92115.              0.127               0.01    921.    8885.
#>  3      3   84151.              0.127               0.01    842.    8885.
#>  4      4   76108.              0.127               0.01    761.    8885.
#>  5      5   67984.              0.127               0.01    680.    8885.
#>  6      6   59779.              0.127               0.01    598.    8885.
#>  7      7   51492.              0.127               0.01    515.    8885.
#>  8      8   43122.              0.127               0.01    431.    8885.
#>  9      9   34668.              0.127               0.01    347.    8885.
#> 10     10   26130.              0.127               0.01    261.    8885.
#> 11     11   17507.              0.127               0.01    175.    8885.
#> 12     12    8797.              0.127               0.01     88.0   8885.
#> # ℹ 9 more variables: extra_principal <dbl>, principal <dbl>,
#> #   total_principal <dbl>, cashflow <dbl>, ob_end <dbl>,
#> #   negative_amortization <lgl>, timing <chr>, k <int>, payment_source <chr>

# Increasing payments
amort_schedule_general(
  principal = 10000,
  n = 5,
  i = 0.06,
  payment = c(1800, 1900, 2000, 2200, 3000)
)
#> # A tibble: 5 × 15
#>   period ob_start i_effective_annual i_effective_period interest payment
#>    <int>    <dbl>              <dbl>              <dbl>    <dbl>   <dbl>
#> 1      1   10000                0.06               0.06     600     1800
#> 2      2    8800                0.06               0.06     528     1900
#> 3      3    7428                0.06               0.06     446.    2000
#> 4      4    5874.               0.06               0.06     352.    2200
#> 5      5    4026.               0.06               0.06     242.    3000
#> # ℹ 9 more variables: extra_principal <dbl>, principal <dbl>,
#> #   total_principal <dbl>, cashflow <dbl>, ob_end <dbl>,
#> #   negative_amortization <lgl>, timing <chr>, k <int>, payment_source <chr>

# Period-specific annual effective rates
amort_schedule_general(
  principal = 10000,
  n = 4,
  i = c(0.04, 0.05, 0.06, 0.07),
  payment = NULL
)
#> # A tibble: 4 × 15
#>   period ob_start i_effective_annual i_effective_period interest payment
#>    <int>    <dbl>              <dbl>              <dbl>    <dbl>   <dbl>
#> 1      1   10000                0.04               0.04     400    2818.
#> 2      2    7582.               0.05               0.05     379.   2818.
#> 3      3    5143.               0.06               0.06     309.   2818.
#> 4      4    2634.               0.07               0.07     184.   2818.
#> # ℹ 9 more variables: extra_principal <dbl>, principal <dbl>,
#> #   total_principal <dbl>, cashflow <dbl>, ob_end <dbl>,
#> #   negative_amortization <lgl>, timing <chr>, k <int>, payment_source <chr>

# Payment determined from the current balance
payment_rule <- function(
  period,
  ob_start,
  i_effective_period
) {
  1500 + 100 * (period - 1)
}

amort_schedule_general(
  principal = 8000,
  n = 6,
  i = 0.05,
  payment = payment_rule
)
#> # A tibble: 6 × 15
#>   period ob_start i_effective_annual i_effective_period interest payment
#>    <int>    <dbl>              <dbl>              <dbl>    <dbl>   <dbl>
#> 1      1    8000                0.05               0.05    400     1500 
#> 2      2    6900                0.05               0.05    345     1600 
#> 3      3    5645                0.05               0.05    282.    1700 
#> 4      4    4227.               0.05               0.05    211.    1800 
#> 5      5    2639.               0.05               0.05    132.    1900 
#> 6      6     871.               0.05               0.05     43.5    914.
#> # ℹ 9 more variables: extra_principal <dbl>, principal <dbl>,
#> #   total_principal <dbl>, cashflow <dbl>, ob_end <dbl>,
#> #   negative_amortization <lgl>, timing <chr>, k <int>, payment_source <chr>

# Compact summary
amort_schedule_general(
  principal = 100000,
  n = 60,
  i = 0.08,
  k = 12,
  output = "summary"
)
#> # A tibble: 1 × 6
#>   principal periods_realized total_interest total_paid ending_balance
#>       <dbl>            <int>          <dbl>      <dbl>          <dbl>
#> 1    100000               60         20858.    120858.              0
#> # ℹ 1 more variable: negative_amortization <lgl>